Danielle's trip was all the more special as she had no choice. M. Kosubay's merry men have been hard at work tiling the kitchen floor. The issue was it was too cold in the house for the cement to dry so everything would have come to a halt if this was not resolved.
![]() |
| In the beginning |
| Hard at work |
| 2/3 Done |
| Complete |
| Island Breakout |
| Tile meets dining room floor |
In addition to the great work done in the kitchen this week, we had a wee bit of a set back due to the cold. It had an adverse effect on some of the work already done by M. Senta's wall prep. This was due to the difference in temp between inside the house and the extreme outside temperature and now requires some work to be redone.
| Ice on the inside window |
| Icicles |
Other progress this week has been the wet room in the master bedroom. This room used to be a closet and so all the plumbing has been added, a special fibre board inserted on the floor and the walls treated prior to tiling.
| Fibre Board,tile and drain |
The family bathroom tile also started to go down this week
| Family Bath Floor |
Lower down in the dungeon work went on with the installation of the new doors. The amount of work so far completed is staggering and apart from the obvious it is now becoming evident as we can see part of the garage floor as seen in the last picture!
| Start of Cave Door |
| Cave Door Finished |
| Look Space on the floor (house must be nearly finished) |
The last piece of work this week was the forms for the downstairs landing area
Lets see what next week brings!


I bet this next week brings the completion of the tile work in the house. Let's hope when the decorator, M. Senta, comes back that he doesn't run out screaming at all the work that has to be redone from the freezing temperatures.
ReplyDelete